Projects
Slippery Rock MHP blower and piping replacement.
In 2017, Slippery Rock was placed under an order of consent by NYS DEC. Some of the work required under this order was to replace the main aeration system blower, the holding tank blower and return activated sludge piping. We completed this work and greatly improved plan performance. A modern blower with new controls made…
Crosswinds constant pressure water distribution system.
Prior to this project, Crosswinds, a lakeside community in Ellery, NY, had problems with low and fluctuating water pressure. The existing pumping system allowed pressure to drop as low as 25 psi before coming on, which meant pressures below 20 psi in some residences. The fix this, we installed 2 Aquavar variable frequency drives, made…
Crosswinds marina pump.
Crosswinds also owns and operates a small marina. They were having major issues with algae and seaweed buildup in the marina. During warmer temperatures, the stagnant water in the marina allowed algae to bloom out of control. We procured and installed a submersible pump to install in the marina, and put piping in the ground…